亚洲午夜成人片-日韩人妻无码系列专区-国产第一页浮力影院入口-宅男宅女精品国产av天堂

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Precautions for injection molding

Release time:2024-06-05

1. Shrinkage in injection molding isInjection moldingIt is a very common problem, especially for plastic products with high surface quality requirements. Therefore, with the continuous improvement of injection molding technology, it is imperative to minimize the shrinkage of injection molding and improve product quality.

1.jpg


2. The shrinkage formed in the thicker part of plastic parts (such as ribs or protrusions) is more serious than that of adjacent parts. This is because the thicker part cools much slower than the surrounding area. Different cooling rates will lead to the formation of dents on the joint surface, which is called shrinkage marks. This defect seriously limits the design and molding of plastic products, especially large thick wall products such as TV inclined boxes, display boxes and so on. In fact, products with strict requirements such as household appliances need to remove shrinkage holes, while toys and other products with low surface quality requirements are allowed to have shrinkage marks during injection molding.


3. There may be one or more reasons for forming shrinkage marks in injection molding, including processing method, part geometry, material selection, mold design, etc. Geometry and material selection are usually decided by the raw material supplier and cannot be easily changed. However, in mold manufacturers, there are many factors related to mold design that may affect the shrinkage of injection molding. The design of cooling channel, gate type and gate size may have different effects. For example, a small gate, such as a tubular gate, cools much faster than a conical gate. Premature cooling of the gate will reduce the filling time of the cavity, thereby increasing the possibility of shrinkage marks. For molding workers, adjusting processing conditions is a way to solve the shrinkage problem in injection molding. Filling pressure and time significantly affect the shrinkage. After the part is filled, the excess material continues to fill the cavity to compensate for the shrinkage of the material. If the filling stage is too short, the shrinkage will intensify and eventually produce more or larger shrinkage marks. This method to solve the shrinkage of injection molding itself may not be able to reduce the shrinkage mark to a satisfactory degree, but the molding workers can adjust the filling conditions to improve the shrinkage mark.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 亚洲国产精品久久一线不卡| 国产md视频一区二区三区 | 亚洲午夜精品久久久久久app| 欧美巨大黑人极品精男| 欧美激情一区二区三区| 国产产无码乱码精品久久鸭| 国产精品99无码一区二区| 无码乱码av天堂一区二区 | 被按摩的人妻中文字幕| 九九综合九色综合网站| 人人爽人人爽人人片a免费| 人人妻人人澡人人爽欧美精品| 中文字幕人成乱码熟女| 国产女人水真多18毛片18精品| 久久亚洲国产精品五月天婷| 色偷偷噜噜噜亚洲男人| 亚洲av日韩精品久久久久久a| av无码中文字幕不卡一区二区三区| 人妻被按摩师玩弄到潮喷| 国内精品久久久久久中文字幕| 一本一本久久a久久精品综合| 成熟丰满熟妇xxxxx丰满| 久久精品国产99国产精偷| 国产精品va在线播放我和闺蜜| 日韩网红少妇无码视频香港| 亚洲中文无码mv| 乱精品一区字幕二区| 午夜亚洲av日韩av无码大全| 少妇被黑人到高潮喷出白浆| 色偷偷av一区二区三区| 日韩精品一区二区三区视频 | 国产精品狼人久久久久影院| 上司揉捏人妻丰满双乳电影| aa级女人大片免费视频| 国产精品偷窥熟女精品视频| 出差被绝伦上司侵犯中文字幕| 色先锋av资源中文字幕| 天天摸天天做天天爽| 国产chinese男男gay视频网| 樱桃视频大全免费高清版观看下载| 欧美丰满熟妇xx猛交|