Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 丰满妇女毛茸茸刮毛| 亚洲欧美日韩综合久久久久| 国产精品久久久天天影视| av 日韩 人妻 黑人 综合 无码| 天天摸天天摸色综合舒服网| 我要看a级毛片| 国产高清在线精品一区app| 中文在线а√在线天堂中文| 亚洲精品无播放器在线播放| 三年片观看免费| 天天爽夜夜爱| 精品久久久无码中文字幕| 久久精品国产亚洲av麻豆长发| 欧美成妇人吹潮在线播放| 欧美黑人粗大xxxxbbbb| 国产高清精品软件丝瓜软件| 久久人人妻人人做人人爽| 国产初高中生在线视频| 国产乱人伦av在线a| a级无遮挡超级高清-在线观看| 人妻少妇偷人精品无码| 在线中文字幕亚洲日韩2020| 亚洲国产欧美在线人成| 久久夜色撩人精品国产小说| 精品日产一区二区三区 | 国产第19页精品| 九九综合va免费看| 美女视频黄是免费| 日产国产精品亚洲系列| 精品人妻一区二区三区四区在线 | 日韩精品一区二区三区色欲av| 韩国三级中国三级人妇| 亚洲区小说区图片区qvod| 丰满又黄又爽少妇毛片| 国产99久久久久久免费看| 啪啪东北老熟女45分钟| 日日天干夜夜狠狠爱| 国产精品无码av天天爽| 久久久亚洲欧洲日产国码二区| 久久久久99精品成人片试看| aaaaa少妇高潮大片|